We now offer shipping to selected EU countries! Order now and enjoy reliable delivery.

Msikaba Bridge

Gap filling at Msikaba Bridge

Project overview

During the construction of the Msikaba Bridge in South Africa – one of the largest cable-stayed bridges in Africa – welding delays caused deformation of the base plate during the installation of the anchor blocks. To ensure full force transmission of the tension cables, the gap between the base plate and the bearing plate was filled with MM1018. The application permanently ensured the structural integrity of the anchoring.

Inspiring facts:

Product

MM1018 – The Liquid-Shim®

Location

Lusikisiki, South Africa
Dimension
Africa’s largest bridge project

Gap filling between base plate and bearing plate

Another impressive example of the use of MM1018 is its application on the Msikaba Bridge in South Africa. The cable-stayed bridge is one of the country’s most important infrastructure projects. During the installation of the anchor blocks, thermal deformation occurred on the embedded base plate as a result of welding processes. This base plate is used to anchor the tension cables. The resulting distortions meant that there was no longer full contact between the base plate and the bearing plate – a prerequisite for uniform and safe force transmission. To restore a form-fitting and force-fitting transition, the resulting gap was injected with MM1018, the liquid version of the product. First, the annular gap between the sleeve embedded in the ground and the bearing plate was sealed all around with MM1018 Seal. Then, the liquid metal was injected precisely through the designated inlet and vent openings. This measure ensured a permanent connection between the base plate and the bearing plate – and thus the load-bearing capacity and safety of the entire anchoring structure.

MM1018 once again proved its effectiveness as a precise, permanently load-bearing and globally proven solution for gap compensation in highly stressed component connections.

You are currently viewing a placeholder content from YouTube. To access the actual content, click the button below. Please note that doing so will share data with third-party providers.

More Information

MM1018 at Msikaba Bridge – Gap Compensation in Base Plate

MM1018 – The Liquid-Shim® played a main role in restoring structural integrity at one of Africa’s largest infrastructure projects: the Msikaba Bridge in South Africa.

Your contact

Carsten Vogels

Sales International
E-Mail: carsten.vogels@diamant-polymer.de

Mr. Carsten Kunde

Do you have any questions?

I am happy to support you.

Mr. Erkan Polat

You have any questions?

I am happy to support you.