25th bail bridge Lisbon Portugal

Replacement of 500 bridge bearings on the 25 de Abril Bridge in Lisbon with MM1018

Project overview

Replacement of 500 bridge bearings on one of Europe’s busiest suspension bridges – while traffic continued to flow. Using MM1018 (Liquid) – The Liquid-Shim® – it was possible to create a force- and form-fitting connection that guarantees maximum stability with minimal downtime.

Inspiring facts:

Product

MM1018 – The Liquid-Shim®

Location

Lisbon, Portugal
Project implementation
500 bridge bearings replaced while traffic continued to flow

Efficient bearing refurbishment on the 25 de Abril Bridge

The 25th Abril Bridge in Lisbon is a 3.2 km long suspension bridge with a main span of 1,013 m, which is used by around 160,000 vehicles and 140 trains every day. After more than 50 years of operation, around 500 bridge bearings had to be replaced while traffic continued to flow due to insufficient shimming. Conventional methods such as shim plates or wedge plates would have been too time-consuming and costly. Instead, our innovative solution MM1018 – The Liquid-Shim® was used. The two-component metal-polymer system enables a 100% force- and form-fitting connection without mechanical reworking and at the same time protects against crevice corrosion. The application was carried out with injection pads, which enable simple and fast processing even with complex geometries. Thanks to this solution, the replacement of all bearings was completed within just 167 hours – while traffic continued to flow.

Your contact

Carsten Kunde

Sales International
E-Mail: carsten.kunde@diamant-polymer.de

Which industries are you interested in?

Select the industries relevant to your business to receive tailored news, insights and product updates. Multiple selections are possible.

You will receive an email to confirm your newsletter subscription.

Mr. Carsten Kunde

Do you have any questions?

I am happy to support you.

Mr. Erkan Polat

You have any questions?

I am happy to support you.